最后! Tram line 49 runs regularly from Monday after track renewal!
最后! Tram line 49 runs regularly from Monday after track renewal!
Good news for all passengers of the Viennese tram line 49: From June 30th, the popular line will be on your usual route again.经过三个月的密集轨道更新后,现在是时候报告了[OE24](https://www.oe24.at/oesterreich/oesterreich/chronik/wien/wien/new/nach/nach-dreii-monaten-faehr-ab-monaten-faehr-ab-mont-montag-wieder-wieder-regulaer-regulaer/63876044)一下。 The construction work that started in April had the goal of significantly increasing both the speed and comfort on Hütteldorfer Straße.总共续签了约1,800米的轨道和架空线,这尤其使Penzingen乘客受益,他们可以期待更快,更准时的连接。
The construction project also brought some improvements for the stops. There is now an additional bank at the Johnstrasse stop, and the waiting area was widened to 3.50 meters. The Breitensee stop has also been optimized to improve the connection to the Ludwig-Zatzka Park. In addition, a new needs stop in the reversing loop is to be created. These measures show that the Viennese lines have a good knack for the needs of their passengers.
modernization and expansion in the Ludwig-Zatzka-Park
The modernization of the stops is only part of a larger project. The Ludwig-Zatzka Park in Penzing is also expanded and climate. On an area of 2,550 m², 33 new trees and numerous green areas are planted to cool down on hot days and a pleasant atmosphere. A water basin with drinking fountain and water nozzles is also installed. In addition, two Calisthenics and three fitness equipment as well as many seating are planned.根据[5min](https://www.5min.at/520250281105/neue-leise-leise-und-mehr-komfort-hier-bald-hier-bald-du-bald-schneller-unterweg/ ),2025年,该项目完成了这个项目的完成。
The redesign of the forecourt at the S-Bahn station Breitensee is intended to further upgrade this important junction of public transport. This shows how important well-thought-out city and traffic planning is for the quality of life and mobility of the citizens.可持续和高效的机动性不仅对维也纳人来说很重要,而且是所有未来计划的重点,以及[bmdv](https://www.bmv.de/shahareddocs/de/de/de/artikel/dg/artikel/dg/aktuell/aktuell/stadt--und-und-und-und-und-und-und-und-und-und-verkehrsplan一下)一下。 It is about promoting alternative means of transport and new mobility concepts to reduce dependence on private cars.
In the past few months, lines 46 and 52 have partially taken over the sections of line 49 while the track construction work was underway.这些临时转移使乘客能够继续舒适地工作,并不必在没有公共交通便利的情况下去城市。总而言之,事实证明,通过这个全面的轨道更新计划的维也纳线条不仅追求技术,而且还可以可持续地改善维也纳的公共生活和城市流动性。
Details | |
---|---|
Ort | Penzing, Österreich |
Quellen |
Kommentare (0)